Author by Jay Goh, Director at AGLK
The project brief is agreed. The architect is developing the layout. The programme is moving.
Then comes a familiar response to the request for existing services drawings:
“We don’t have any as-builts.”
For building owners, project managers and designers, this creates an immediate question: how do we move forward when the information we would normally rely on is missing?
Missing drawings do not automatically make a project unworkable. They do, however, change how the design needs to be approached.
In our previous article, we explored the importance of understanding existing building services. When as-builts are unavailable, the next step is deciding what information is needed to support each design decision.
Start With the Decisions That Matter
Recreating a complete set of drawings for an entire building is not always necessary. The investigation should be proportionate to the proposed works and the consequences of getting something wrong.
A tenancy refurbishment might depend on a few critical questions:
- Can the existing air-conditioning and ventilation systems support the proposed use?
- Is sufficient electrical capacity available for the new equipment?
- Where can new drainage connect, and do the levels allow it?
- Do services passing through the tenancy also serve other occupied areas?
These questions help define the investigation scope. If an unknown could change the layout, require a major upgrade or affect another tenant, resolving it early deserves priority.
Build the Picture From Several Sources
Even without as-builts, useful information often exists elsewhere.
Equipment schedules, maintenance records, previous fitout drawings, test reports and building management system information can help establish how the building is serviced. Facilities managers and maintenance contractors can also provide valuable context about past modifications and recurring operational issues.
Each source needs to be considered for what it actually demonstrates. An equipment label can identify a unit’s nominal duty, but it does not confirm the performance being delivered to a space. A previous drawing can suggest a service route without confirming that it remains in use.
Combining these sources with targeted inspection and testing helps build a more reliable basis for design.
We have also recently brought Matterport scanning capability in-house to support this process. For projects where existing documentation is limited, a digital scan can provide the design team with a detailed visual record of the site, helping to capture plant locations, service routes, spatial constraints and other existing conditions that may need to be revisited as the design develops.
It does not replace targeted investigation, testing or intrusive verification where these are required, but it provides a stronger reference point than relying on photographs, memory or incomplete drawings alone.
Make Assumptions Visible
Early design often involves assumptions. The important part is making them explicit and identifying when they need to be checked.
Consider a proposed tenancy split. Knowing where an air-conditioning unit is located does not establish which areas it serves. If it also supplies the neighbouring tenancy, that finding could change the servicing strategy, controls and staging of the works.
A concept layout can identify a provisional approach while service tracing is arranged. Finalising that arrangement requires the relevant connections and boundaries to be verified.
For each significant assumption, the project team should understand the evidence available, what remains unresolved, who will arrange verification and which decision depends on the result.
This gives the client a clearer view of both progress and outstanding risk.
Plan Verification Around the Programme
In an occupied building, even a detailed site inspection or digital scan cannot answer every question. Ceiling access, opening-up works, testing or temporary shutdowns can still require tenant coordination and specialist contractors.
These activities should be planned around the decisions they inform.
If a drainage connection determines the location of new amenities, checking it after the layout has been approved creates avoidable redesign risk. If electrical capacity determines whether an upgrade is required, that assessment needs to inform the budget and equipment selections.
Where verification must wait, the team should agree which work can proceed, which decisions remain provisional and what allowances or alternatives are needed.
A broad “contractor to verify on site” note, on its own, does little to explain those dependencies or help the team plan for them.
Leave Better Records for the Next Project
Working without as-builts also highlights the value of closing out the current project properly.
The scope should establish who will prepare, review and hand over updated records of the completed works, including changes made during construction. Any limits to the information recorded should be clear.
That documentation gives the building owner and the next project team a stronger starting point.
At AGLK, our approach is to identify the information that matters, prioritise verification and make the basis of design clear. This helps clients understand what can move forward confidently and what needs to be resolved before further commitments are made.
Designing without as-builts is ultimately about managing uncertainty well — one informed decision at a time.